| Pipeline Construction | |||
| - | Welded Carbon Steel Lines: 2” to 30” diameter. | ||
| - | Welded Stainless Steel Lines: 1” to 20” diameter. | ||
| - | Fusion of high density polyethylene (HDPE): 4” to 32” diameter. | ||
| - | PVC pipe installation using slip joint or restrained joint configuration: ¾” to 36” diameter. | ||
| - | Complete staff of welders certified to work on product pipelines. | ||
| - | Equipped for hard rock trenching and backfill. Capable of screening backfill materials. | ||
| - | We are very aware of the local landowner requirements from trenching, backfill and topsoil preservation in this area. Triad is very conscientious about keeping the landowners we encounter pleased with both our client and ourselves. | ||
| Gas Compression Facilities: | |||
| - | Installation of temporary unitized compression units, including; earthwork, concrete foundations and pipeline connections. | ||
| - | Complete construction of larger compression plants, including; concrete foundations, slabs, settings/mounting compressor units and other applicable equipment, building construction, interior/exterior piping and manifolds. | ||
| - | Triad makes every effort to see that all projects, including compression facilities, are coordinated seamlessly with the owner, owner’s representatives, engineers and other individuals involved with the project in question. | ||
| Roustabout Services & Heavy Hauling: | |||
| - | We perform roustabout services for wells, plants, gathering facilities, etc. | ||
| - | We also perform heavy hauling of pipe and equipment to our customer’s site of choice. | ||
| - | Triad’s understanding of the oil and gas process as a whole ensures that we’ll get the job done properly, putting our customer's mind at ease. | ||
| - | Triad has a complete list of trade and equipment rates available for our customer’s reference. | ||
| - | Crews can usually be made available on short notice. | ||
| Safety Policy & Culture: | |||
| - | Triad maintains and enforces a stringent safety program which is registered with ISNET and meets DOT standards. Membership in ISNET guarantees constant updating of our safety policies and personnel qualifications. | ||
| - | Two full-time safety personnel are employed by Triad to implement and enforce our safety program. | ||
| - | OQ personnel are available for all oil and gas related tasks that Triad partakes in. | ||
| - | We maintain a mandatory pre-hire and random drug screen program. | ||
| Safety is very important to Triad. We work hard to make sure all of our employees are as informed as possible about keeping their co-workers and themselves safe. All of our hard work and successful projects mean nothing if we’re unable to send everyone home at the end of the day. | |||
| Corporate or Master Service Agreement Information
Carla Hoehn - Vice President / Corporate Secretary
(970) 565-4257 – Main Office
(970) 565-1057 – Fax
|
|||
| Project Information or Scheduling
Randy Curtis - Oil and Gas Operations Manager
(970) 565-6143 - Shop
(970) 565-6410 – Fax
|
|||
| General Management
Terry Gorsuch - President
(970) 565-4257 – Main Office
(970) 565-1057 - Fax
|
|||